Place of Origin: | Zhejiang, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
Anti Ultraviolet FRP Casing Cooling Tower Parts Replacement
Quick Detail:
The manufacturing process for FRP casing consists of 7 processes: Raw materials preparation, Mould preparation, Hand paste molding, Solidify, Take off the mould, Disposal, Inspection
Description:
The appearance color of FRP casing applies the slivery white color or other colors so as to keep it harmonization with environment. The specified color by owner is available. FRP casing shall be made of qualified material, which is certified to be qualified by the National authorized department.
Applications:
Cooling Tower
Specifications:
NO. |
Width |
Length |
Thickness |
Remarks |
1 |
202300 mm |
206200mm |
3.0mm |
|
The width ,length and thickness could be adjusted by client’s requirement. |
Competitive Advantage:
1.Long life: The service life of FRP casing shall be more than 20 years
2.Ageing Resistance and Ultraviolet
3. Anti-corrosion Design:Non-metal design assures the corrosion problem.
HOHD Cooling Engineering Co., Ltd [China (Mainland)]
Business Type:Manufacturer
City: Dongguan
Province/State: Guangdong
Country/Region: China (Mainland)